News

# Private Label Kamado Grills: Timeline, Tooling, and What to Prepare Before You Contact a Factory

**Most of the elapsed time in a private label kamado project is not manufacturing — it is approval. Artwork rounds, colour matching, and sample sign-off typically account for more of the schedule than production does. Production itself runs 20–30 days after the deposit clears and the final product is approved, with samples at about 7 days. If you want a private label range on shelf by a fixed date, the work that matters most is the work you do before you contact the factory.**

## What “private label” actually means in this category

A ceramic kamado is not a product where a new brand creates a new tool. In practice, private label in this category means customising an existing, proven platform:

| What you can customise | What it involves |
|—|—|
| Colour | Standard options are already black, red and green; custom colours are also produced |
| Logo and brand marks | Applied to the body, the metal band, and the carton |
| Packaging artwork | Fully custom retail cartons, printed to your brand system |
| Finish and texture | The ceramic surface finish is a genuine differentiator in this category |
| Size selection | Building your range from the existing size ladder |
| Accessories and bundle | Side shelves, covers, tools, and other package contents |

What private label does **not** usually mean here is a new ceramic mould. The ceramic body is a fired part with significant process development behind it. Designing a new body from scratch is a product-development project, with a completely different timeline and cost structure.

## What to prepare before you contact a factory

This list is what separates projects that hit their launch date from projects that slip. Prepare all six before the first serious conversation:

1. **Your brand assets** — logo files in vector format, brand colours with references (Pantone or equivalent), and any mandatory brand-mark rules.
2. **Your target retail price** — not a range, a number. It determines which sizes, finishes, and accessory bundles are viable.
3. **Your volume plan** — first order quantity and an annual estimate. Volume affects colour scheduling, which affects your minimum.
4. **Your market** — the country you are selling into, because compliance requirements differ and they can affect component choices.
5. **Your packaging concept** — structure and artwork, or at least a clear brief. Packaging is where most artwork revision cycles happen.
6. **Your delivery date** — the date product must be on shelf, from which you work backwards through transit, production, and approvals.

Arriving with these six items shortens the process more than any negotiation tactic.

## Where the timeline actually goes

The manufacturing steps are the easy part to plan. The elapsed time accumulates in approvals:

| Phase | What happens | How to control it |
|—|—|—|
| Brief and quotation | Specification agreed, price and loading quantities confirmed | Have the six items above ready |
| Sampling | A sample is produced to the agreed specification; our sample lead time is about 7 days | Approve in one round where possible; separate must-fix from nice-to-have |
| Artwork and colour approval | Logo placement, carton artwork, colour matching | Consolidate feedback into one document per round, not a message thread |
| Pre-production confirmation | Final spec, final artwork, packaging specification locked | Lock it in writing before the deposit is paid |
| Mass production | 20–30 days after the deposit clears and final approval is given | Ensure the deposit and the approval land in the same week |
| Transit and clearance | Sea freight, customs, inland delivery | Add this to your launch planning; it is not part of the production window |

The pattern worth noticing: production is a defined block, while approval is open-ended unless you manage it. Projects rarely slip because the factory was slow. They slip because approvals stretched.

## Tooling, and who owns it

Ask this question early, because it is easy to get wrong and expensive to fix later:

- **Printing plates and dies** for custom packaging — who pays for them, and who holds them if you change supplier?
- **Logo application tooling** — for example, any plate or fixture used to apply your branding to the metal band
- **Colour verification** — what is the agreed reference, and how is a colour match confirmed on production units, not just on a sample?

Get the answers in writing. Ownership of tooling is exactly the kind of detail that is obvious to both parties in year one and disputed in year three.

## Cost drivers in a private label project

Four variables move the price. Knowing which ones you are using lets you trade deliberately:

| Driver | Why it costs more |
|—|—|
| Custom colour | Requires separate kiln scheduling rather than running with a standard colour |
| Custom logo application | Additional tooling and a process step per unit |
| Custom packaging | Printing plates, proofing rounds, and a separate carton specification |
| Low volume | Fixed costs — tooling, artwork, colour setup — spread across fewer units |

If budget is the constraint, the sequence is clear: start with a standard colour and custom packaging, then add custom colour once volumes justify the scheduling cost.

## How we run private label projects

Fujian Auplex Kamado Grill Co., Ltd. was founded in 2003 and began kamado production in 2010. Our plant has been set up for flexible OEM terms since 2013, when we moved into a facility with computer-controlled electric kilns that made more flexible production runs practical. We produce custom colour and logo applications, and we have supplied international retail chains including COSTCO, MGB, BUNNINGS and CTC, all of whom audit their suppliers before placing volume.

Our full production history is on the [About Us page](https://www.auplexbbq.com/about-us/), and the current platform range you would be customising is on the [grill page](https://www.auplexbbq.com/grill/).

## Frequently asked questions

**Do I need new tooling for a private label kamado?**
Usually not for the ceramic body. Custom packaging needs printing plates, and logo application may need a fixture. New ceramic moulds would make it a new product development project rather than private label.

**How long does a private label kamado take from first contact to delivery?**
Production is 20–30 days after deposit and final approval, with samples at about 7 days. The variable is your approval cycles and transit time, so build the schedule backwards from your on-shelf date.

**What is the minimum quantity for a custom colour?**
It depends on kiln scheduling, since a custom colour has to be run as its own batch. Ask for the figure for your specific colour against a standard colour so you can compare the trade-off.

**Can you print our logo on the packaging and the product?**
Yes — logo and colour customisation is standard practice for us. Send vector artwork and your colour references in the first brief.

**Who owns the packaging printing plates?**
Agree this in writing before production. The usual arrangement is that the buyer pays for tooling, so confirm that ownership transfers to you and that you can retrieve it if you change supplier.

**What happens if we change the size after approving a sample?**
The schedule restarts from the sampling stage, and the deposit terms may need revisiting. Decide your size ladder before sampling begins.

**Can we start with a small private label run?**
Yes, but expect customisation to raise the minimum quantity. Starting with a standard colour and standard packaging keeps a first run small, and you can add customisation once volumes are established.

**Do you support compliance requirements for our market?**
Tell us your destination market in the brief. Compliance requirements differ by country and can influence component selection, so they need to be part of the specification, not an afterthought at shipping.

## Start with your brief

Send us your brand assets, target retail price, volume plan, destination market, packaging concept, and on-shelf date, and we will come back with a specification, a price, and a realistic schedule. Email **vivian@auplexbbq.com** or use our [contact form](https://www.auplexbbq.com/contact-us/).

**Author**
Auplex Export Team — Fujian Auplex Kamado Grill Co., Ltd.
Ceramic kamado grill manufacturing since 2010 · Minhou, Fuzhou, Fujian, China
[www.auplexbbq.com](https://www.auplexbbq.com/)


Post time: Sep-08-2026